A Work in Progress

Construction time varies considerably, and is very much dependant upon the size and nature of the project.

A Work in Progress Stage One
Large pressure-impregnated foundation timbers support the weight of the tree house. Braces fastened around the base of the tree or stilts secured into the ground provide adequate support for the structure.





A Work in Progress Stage Two
The tree house frame takes shape around the trunk of the tree. The platform has been lined with ribbed timber decking to provide a safe, solid and level surface.






A Work in Progress Stage Three
Next, the roof is constructed from smooth roofing joists and lined with 12mm marine ply. It will be covered with heavy-duty green mineral roof felt.









A Work in Progress Stage Four
The roof is finished with Cedar shingles to create an attractive and long lasting weatherproof finish.










A Work in Progress Finished
The Childrens play equipment has been installed, including a fireman's pole, rope ladder, traditional swing, and a 50-metre zip wire crossing the garden. A rope bridge also connects the tree house to an adjoining drinks deck for the adults.